PoC Design & Validation Framework
Over 68% of enterprise pilots stall due to zero baseline discipline and the 100% precision trap. Deploy rigorous control groups to mathematically prove business ROI.
The 6 Fatal PoC Anti-patterns
1. No Pre-measured Baseline
Starting without knowing how many minutes a manual clerk takes makes post-trial improvement impossible to mathematically prove.
2. The "100% Accuracy" Trap
NTT Data ↗Insisting on flawless outputs before roll-out. NTT Data notes 68% of Japanese enterprise PoCs stall here. The correct metric is net speedup with human verification.
3. Overscoped Pilot Complexity
Attempting to automate end-to-end ERP reconciliation at once rather than isolating a single data entry or RAG step.
4. Poor Dirty Source Data
Garbage in, garbage out. If supplier masters are unindexed or PDFs are photocopied illegibly, fix data hygiene first.
5. Missing Parallel Control Group
Failing to run an AI-assisted group parallel to a manual group, making it impossible to separate AI impact from seasonality.
6. Unclear Exit / Failure Thresholds
Without an agreement on when to kill an unsuccessful project, funds drag on indefinitely without outcomes.